Home About us Products Sectors Design Studio Case Studies Documents Contacts << Back    Login >>
people
Armitage Venesta Washroom System
High Quality facilities for High Speed Station | Equinox

Ebbsfleet Station | Equinox

The formal opening by Dame Kelly Homes of Ebbsfleet International, a key station on the High Speed line, signified the completion of the £6billion High Speed project which enables travel of up to 140 miles per hour into the heart of London.

 

Stylish Equinox cubicles with streamline, polished pilasters were supplied by the UK’s leading washroom provider, Armitage Venesta for installation within the contemporary glass and steel construction designed by consortium, Rail Link Engineering. 

  

Armitage Venesta’s pre-plumed system, IPS Evolve, with its factory fitted sanitary ware, was used to provide easy clean surfaces that promote hygiene and provide easy access for ongoing maintenance.

 

For more information on Armitage Venesta’s washroom systems and IPS Evolve®, call 01474 353 333 or visit www.armitage-venesta.co.uk.


Related Products
 


Image of Ebbsfleet Station | Equinox

         
 

Case Studies Case Studies
  Journalists library
   
  Document Downloads Document Downloads
Ebbsfleet StationEbbsfleet Station
     
Sitemap

Registration number: 06129513 | VAT number: 894309686

Venesta Washroom Systems, Alder Flat Drive, Newstead Industrial Estate, Trentham, Staffordshire, ST4 8HX